The schedule

Planned, starting Mon, Dec 7, 2026. We are preparing for SOC 2: the controls are scheduled and will be run on these dates from then, each leaving a line in the evidence log below.

Subscribing keeps your calendar in step when this page changes; a download is a one-time copy. Each event marks the day a window opens for its controls, with an alert at 9am where your calendar app honours one (Google uses your own default reminders instead).

If a button does nothing, copy the feed address and add it by hand: Google Calendar, Other calendars, + then From URL; Apple Calendar, File, New Calendar Subscription; Outlook, Add calendar, Subscribe from web. A personal Outlook.com account uses outlook.live.com rather than the work address the Outlook button opens.

December 2026

  • Monthly
  • Quarterly
  • Yearly
Mon
Tue
Wed
Thu
Fri
Sat
Sun

Control calendar and evidence log

Every recurring control, when it runs, who runs it and what it leaves behind. Without a compliance platform this is how the controls show they operated; with one, it becomes the platform's task list. Draft 28 Oct 2026. Owner: Dan. SOC 2 CC1.2, CC4.1, CC4.2, CC5.3; items TS-2, TS-4.

The rule for evidence: each run leaves a dated file under docs/compliance/evidence/<year>/ (or in the platform once chosen), named <date>-<control>.md, and a line in the log at the foot of this page. An auditor samples the dates; a missing one is an exception in the report.

When each control is due. A control is on time if it is done by its due date; the calendar date is a reminder that the window has opened, not the deadline. An auditor tests against what this page says, so it says a window rather than a day:

Cadence Reminder Due by
Monthly First Monday of the month The 10th working day of the month
Quarterly Third Monday of January, April, July and October The last working day of that month
Yearly Second Monday of the month in its Month column The last working day of that month

The three reminders fall on different Mondays so no single day carries a month's, a quarter's and a year's work at once. Working days are Monday to Friday.

A yearly control's month is the month it first runs. Each first run is a readiness task before the Type I (Month 2 is December 2026, Month 3 is January 2027, fieldwork is Month 4), so the first run counts as the first year's and the anniversary falls in the same month. If a first run lands in a different month, move the row to that month.

On a calendar. The hub draws this page with its schedule on top and a calendar link anyone may add to their own calendar; nothing is put on anyone's calendar for them. The dates come from this file; change a row here and the calendar follows on the next build.

Schedule starts: 2026-12-07. Until then the schedule is planned, not run: we are preparing for SOC 2, and the evidence log fills once the controls start. Move the date here when the start moves.

Monthly

Control Who Evidence Items
Review every pull request merged into lucent-axis/scope last month (gh pr list --state merged --search "merged:YYYY-MM-01..YYYY-MM-31") Security owner The list, with a line per High-risk or emergency change; a change the security owner made is reviewed by the platform owner CC8.1, CC5.1, ORG-07, TS-11
Dependabot and CI scan findings: open criticals older than 7 days, highs older than 30 App owner Screenshot or export of the open alerts, and the fix or the risk-register entry ORG-26, SC-7
Dashboard change log up to date Platform owner The table in the change-management policy TS-9
Security settings against the baseline: python3 scripts/compliance/baseline_check.py --save, then the dashboard rows read by hand into the same file; every DRIFT either named to its readiness item or put back and logged Platform owner <date>-security-baseline.md TS-13, CC7.1
Capacity: psql "$SUPABASE_DB_URL" -f scripts/compliance/capacity.sql per client project (disk, connections, cache, largest tables, long queries; WATCH at 70%), and Supabase > Reports for CPU; anything WATCH gets a plan Platform owner The script's output and a line AV-5, A1.1
Security events: app logins flagged NEW or needing attention, and every access change of the last 35 days (psql "$SUPABASE_DB_URL" -f scripts/compliance/app_access.sql, per client database), and sign-in failures in Supabase > Logs > Auth Platform owner The script's output and a line on anything unexpected LM-2, CC7.2

Quarterly

January, April, July and October: reminder on the third Monday, due by the month's last working day.

Control Who Evidence Items
Access review of every account Security and platform owners scripts/compliance/access_review.sh output plus the filled review table, signed by both ORG-20, VE-4, ID-1
Security review meeting: this calendar's misses, open risks, incidents, changes to the system Security and platform owners Minutes: who attended, what was decided, each miss and its fix TS-2, CC4.2
Risk register reviewed Security owner The register's date and changes ORG-17
Restore spot check: one table restored from backup into a throwaway project Platform owner The restore test record ORG-23, AV-1
Device check against the BYOD policy: Google Workspace endpoint verification where the edition reports it, else a dated screenshot per laptop (disk encryption, screen lock, OS version) Everyone, collected by the security owner The report or the screenshots, per laptop ORG-15

Yearly

Control Month Who Evidence Items
Security awareness training, then the policies reviewed and re-signed by everyone (one sitting) December Security owner, everyone Completion record and signed acknowledgement per person ORG-09, ORG-14
Risk assessment redone December Security owner The new register ORG-17
Vendor SOC 2 reports read; CUECs checked December Security owner Notes per vendor VN-1, ORG-18
Secrets and keys rotated: the database password, Supabase secret keys, Vercel and GitHub tokens, the vault's production items; the credential listing's "Last rotated" updated (onboarding-offboarding.md) December Platform owner The credential listing with its new dates, and a line in the dashboard change log VE-2, OW-8
Incident response tabletop (tabletop-exercises.md, exercise 1) January Both owners Exercise record ORG-25
Full timed restore test against RPO and RTO; DR tabletop (tabletop-exercises.md, exercise 2) January Platform owner, both owners for the tabletop Restore test record, exercise record ORG-23, ORG-24
Vulnerability scan or pen test January Security owner Report and fixes LM-4

On an event

Event Control Evidence
Someone joins or leaves The joining or leaving checklist The ticked checklist, dated
A security incident The incident response plan The incident record
A new client, subprocessor or add-on Risk register and subprocessor list reviewed The updated documents
A new source system connected The source-system checklist, ticked in its pull request The merged PR
An emergency merge Comment on the PR within one working day The PR

Evidence log

Date Control Who Where Notes
2026-10-27 MFA enforced on the Vercel team Kyle Vercel API, read 28 Oct First Step 0 evidence
2026-10-28 Dependabot alerts switched on Claude, approved by Dan GitHub API (204) 0 open alerts at first read
2026-10-28 Main ruleset applied on lucent-axis/scope (id 26059181); first changes merged through it, PRs #2 and #3 Dan, the CI session GitHub A direct push refused with GH013 the same day
2026-10-28 Access review member lists, Lucent Axis accounts and database Claude, for sign-off evidence/2026/2026-10-28-access-review.md GitHub: one owner (Kyle). Vercel: Kyle Owner, Dan Member, MFA enforced. Supabase: Kyle Owner, Dan Developer, both MFA on, not required. Company database: 8 persona logins and the hub's sales login, none unexplained. Awaiting the owners' review table
2026-10-28 Monthly review, October (first) Claude, for sign-off evidence/2026/2026-10-28-monthly-review-october.md PRs #1 to #8, all through the required checks; 0 open Dependabot alerts. Awaiting Kyle's sign-off
2026-10-28 App logins on the personal demo database, outside the boundary (app_access.sql; a dry run of the control) Claude This line 9 logins; one with no person behind it, created 25 Sep, signed in once that day. It sees nothing (RLS keys on the person) but should be removed or linked. Not changed: the demo database is frozen while Paul demos on it. Owner: Dan, at the switch
2026-10-29 Security settings against the baseline (first run) Claude, for Dan's review evidence/2026/2026-10-29-security-baseline.md 19 settings read, 8 differ: 7 are open items (OW-6 twice, VE-2 twice, DB-7 twice, LM-1); one is new, GH-6: any member of the GitHub org can create a public repository. Kyle's switch